Meitner Solar

ERCOT queue ID 25INR0080

Meitner Solar (25INR0080) is listed in the ERCOT interconnection queue as a 702.6 MW solar project in Gray County, TX. The filing names Gray (Bus# ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 8, 2028. It records the screening study as complete on November 1, 2022 and the interconnection agreement as signed on January 31, 2024.

Queue ID25INR0080
Project nameMeitner Solar
Status (as published)SS Completed, FIS Started, IA
SubstationGray (Bus# )
Point of interconnection345 kV Gray (Bus# 79000)
CountyGray
StateTX
Voltage345 kV
Capacity702.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-08
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Gray, TX: 3 requests in the ERCOT queue, 3 active totaling 2,120.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityIP Meitner, LLC
CDR reporting zonePANHANDLE
Fuel codeSOL
Technology codePV
Interconnection agreement signed2024-01-31
Screening study complete2022-11-01
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first