Meitner Solar
ERCOT queue ID 25INR0080
Meitner Solar (25INR0080) is listed in the ERCOT interconnection queue as a 702.6 MW solar project in Gray County, TX. The filing names Gray (Bus# ) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 8, 2028. It records the screening study as complete on November 1, 2022 and the interconnection agreement as signed on January 31, 2024.
| Queue ID | 25INR0080 |
|---|---|
| Project name | Meitner Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Gray (Bus# ) |
| Point of interconnection | 345 kV Gray (Bus# 79000) |
| County | Gray |
| State | TX |
| Voltage | 345 kV |
| Capacity | 702.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-06-08 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Gray, TX: 3 requests in the ERCOT queue, 3 active totaling 2,120.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | IP Meitner, LLC |
|---|---|
| CDR reporting zone | PANHANDLE |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2024-01-31 |
| Screening study complete | 2022-11-01 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.