Substation Scout

Three W Solar

ERCOT queue ID 25INR0055

Three W Solar (25INR0055) is listed in the ERCOT interconnection queue as a 110.9 MW solar project in Hill County, TX. The filing names tap Hillboro1_8 - 237 Blanton CKT 1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of September 4, 2026. It records the screening study as complete on June 2, 2022, the full interconnection study as approved on June 18, 2025 and the interconnection agreement as signed on March 28, 2023.

Queue ID25INR0055
Project nameThree W Solar
Status (as published)SS Completed, FIS Completed, IA
Substationtap Hillboro1_8 - 237 Blanton CKT 1
Point of interconnectiontap 138kV 3522 Hillboro1_8 - 237 Blanton CKT 1
CountyHill
StateTX
Voltage138 kV
Capacity110.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-09-04
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityThree W Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2023-03-28
Screening study complete2022-06-02
Full interconnection study approved2025-06-18
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.