Whistle Solar

ERCOT queue ID 25INR0029

Whistle Solar (25INR0029) is listed in the ERCOT interconnection queue as a 56.3 MW solar project in Navarro County, TX. The filing names Tap 213 Haney – Navarro as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 15, 2028. It records the screening study as complete on February 18, 2022.

Queue ID25INR0029
Project nameWhistle Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap 213 Haney – Navarro
Point of interconnectionTap 138kV 213 Haney – 3478 Navarro
CountyNavarro
StateTX
Voltage138 kV
Capacity56.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-05-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGransolar Texas Nineteen, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2022-02-18
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.