Cascabel Wind 1

ERCOT queue ID 24INR0424

Cascabel Wind 1 (24INR0424) is listed in the ERCOT interconnection queue as a 197.8 MW wind project in Zapata County, TX. The filing names Rapido Substation (New ETT Substation) tapping the existing Line from CENIZO7C (#) to DELSOL7C (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 1, 2027. It records the screening study as complete on June 9, 2023 and the interconnection agreement as signed on May 23, 2025.

Queue ID24INR0424
Project nameCascabel Wind 1
Status (as published)SS Completed, FIS Started, IA
SubstationRapido Substation (New ETT Substation) tapping the existing Line from CENIZO7C (#) to DELSOL7C (#)
Point of interconnection345 kV Rapido Substation (New ETT Substation) tapping the existing 345 kV Line from CENIZO7C (#80225) to DELSOL7C (#80307)
CountyZapata
StateTX
Voltage345 kV
Capacity197.8 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2027-12-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityVaquero Wind Energy, LLC
CDR reporting zoneSOUTH
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2025-05-23
Screening study complete2023-06-09
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first