Hollow Branch Creek Solar (24INR0422) is listed in the ERCOT interconnection queue as a 460 MW solar project in Leon County, TX. The filing names Tap Jewett - Singleton as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 30, 2028. It records the screening study as complete on November 29, 2022 and the interconnection agreement as signed on October 22, 2024.

Queue ID24INR0422
Project nameHollow Branch Creek Solar
Status (as published)SS Completed, FIS Started, IA
SubstationTap Jewett - Singleton
Point of interconnectionTap 345kV 3390 Jewett - 44645 Singleton
CountyLeon
StateTX
Voltage345 kV
Capacity460 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Leon, TX: 14 requests in the ERCOT queue, 13 active totaling 6,147.5 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHollow Branch Creek Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2024-10-22
Screening study complete2022-11-29
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first