Eldora BESS
ERCOT queue ID 24INR0338
Eldora BESS (24INR0338) is listed in the ERCOT interconnection queue as a 201.3 MW battery project in Matagorda County, TX. The filing names South Texas Project (Bus# ) – Hillje (Bus# ) Transmission Line Ckt 1 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of July 2, 2028. It records the screening study as complete on September 6, 2022, the full interconnection study as approved on December 18, 2023 and the interconnection agreement as signed on November 15, 2023.
| Queue ID | 24INR0338 |
|---|---|
| Project name | Eldora BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | South Texas Project (Bus# ) – Hillje (Bus# ) Transmission Line Ckt 1 |
| Point of interconnection | 345 kV South Texas Project (Bus# 5915) – Hillje (Bus# 44200) Transmission Line Ckt 1 |
| County | Matagorda |
| State | TX |
| Voltage | 345 kV |
| Capacity | 201.3 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-07-02 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Eldora Energy LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2023-11-15 |
| Screening study complete | 2022-09-06 |
| Full interconnection study approved | 2023-12-18 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.