Pintail Pass BESS
ERCOT queue ID 24INR0302
Pintail Pass BESS (24INR0302) is listed in the ERCOT interconnection queue as a 207.3 MW battery project in San Patricio County, TX. The filing names ANGSTROM as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 31, 2026. It records the screening study as complete on June 16, 2022, the full interconnection study as approved on October 15, 2024 and the interconnection agreement as signed on May 16, 2023.
| Queue ID | 24INR0302 |
|---|---|
| Project name | Pintail Pass BESS |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | ANGSTROM |
| Point of interconnection | 8249 ANGSTROM 345KV |
| County | San Patricio |
| State | TX |
| Voltage | 345 kV |
| Capacity | 207.3 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-08-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
San Patricio, TX: 28 requests in the ERCOT queue, 27 active totaling 6,857.5 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Pintail Pass BESS, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2023-05-16 |
| Screening study complete | 2022-06-16 |
| Full interconnection study approved | 2024-10-15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.