Substation Scout

Ratcliff Solar

ERCOT queue ID 24INR0289

Ratcliff Solar (24INR0289) is listed in the ERCOT interconnection queue as a 85.7 MW solar project in Freestone County, TX. The filing names Tap Long Lake Tap Switch - Long Lake as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 7, 2029. It records the screening study as complete on September 23, 2022.

Queue ID24INR0289
Project nameRatcliff Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Long Lake Tap Switch - Long Lake
Point of interconnectionTap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake
CountyFreestone
StateTX
Voltage138 kV
Capacity85.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-04-07
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGreenalia Solar Power Ratcliff
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2022-09-23
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first