Ratcliff Solar
ERCOT queue ID 24INR0289
Ratcliff Solar (24INR0289) is listed in the ERCOT interconnection queue as a 85.7 MW solar project in Freestone County, TX. The filing names Tap Long Lake Tap Switch - Long Lake as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 7, 2029. It records the screening study as complete on September 23, 2022.
| Queue ID | 24INR0289 |
|---|---|
| Project name | Ratcliff Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Long Lake Tap Switch - Long Lake |
| Point of interconnection | Tap 138kV 3279 Long Lake Tap Switch - 3280 Long Lake |
| County | Freestone |
| State | TX |
| Voltage | 138 kV |
| Capacity | 85.7 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-04-07 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Freestone, TX: 24 requests in the ERCOT queue, 24 active totaling 7,337.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Greenalia Solar Power Ratcliff |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2022-09-23 |
| Water availability | Not Required |