Wensowitch Solar

ERCOT queue ID 24INR0205

Wensowitch Solar (24INR0205) is listed in the ERCOT interconnection queue as a 146.1 MW solar project in Navarro County, TX. The filing names Tapping line Telico (192) to Montfort Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of April 17, 2029. It records the screening study as complete on April 1, 2022 and the full interconnection study as approved on January 9, 2026.

Queue ID24INR0205
Project nameWensowitch Solar
Status (as published)SS Completed, FIS Completed, No IA
SubstationTapping line Telico (192) to Montfort Switch
Point of interconnectionTapping 138 kV line Telico (192) to Montfort Switch (3454)
CountyNavarro
StateTX
Voltage138 kV
Capacity146.1 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-04-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGreenalia Solar Power Wensowitch LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2022-04-01
Full interconnection study approved2026-01-09
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.