Substation Scout

Rowdy Creek Solar

ERCOT queue ID 24INR0186

Rowdy Creek Solar (24INR0186) is listed in the ERCOT interconnection queue as a 351.8 MW solar project in Lamar County, TX. The filing names Woodfin Switch (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of December 29, 2027. It records the screening study as complete on April 27, 2022, the full interconnection study as approved on September 17, 2026 and the interconnection agreement as signed on May 2, 2025.

Queue ID24INR0186
Project nameRowdy Creek Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationWoodfin Switch (#)
Point of interconnectionWoodfin Switch (#1465) 345kV
CountyLamar
StateTX
Voltage345 kV
Capacity351.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-29
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityRowdy Creek Solar LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-05-02
Screening study complete2022-04-27
Full interconnection study approved2026-09-17
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.