Slate Solar Project
ERCOT queue ID 24INR0184
Slate Solar Project (24INR0184) is listed in the ERCOT interconnection queue as a 104.9 MW solar project in Zapata County, TX. The filing names Tap Rio Bravo - San Ygancio as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 15, 2030. It records the screening study as complete on March 10, 2022.
| Queue ID | 24INR0184 |
|---|---|
| Project name | Slate Solar Project |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Rio Bravo - San Ygancio |
| Point of interconnection | Tap 138kV 8646 Rio Bravo - 8985 San Ygancio |
| County | Zapata |
| State | TX |
| Voltage | 138 kV |
| Capacity | 104.9 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-01-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Ignis TX Solar Three LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2022-03-10 |
| Water availability | Not Required |