Zelus BESS

ERCOT queue ID 24INR0131

Zelus BESS (24INR0131) is listed in the ERCOT interconnection queue as a 201 MW battery project in Zapata County, TX. The filing names the Zapata Substation (#; AEP) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 1, 2027. It records the screening study as complete on March 16, 2022.

Queue ID24INR0131
Project nameZelus BESS
Status (as published)SS Completed, FIS Started, No IA
Substationthe Zapata Substation (#; AEP)
Point of interconnectionthe 138 kV Zapata Substation (#8299; AEP)
CountyZapata
StateTX
Voltage138 kV
Capacity201 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-12-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRP Zelus BESS LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2022-03-16

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.