Eytcheson Ranches Solar

ERCOT queue ID 24INR0120

Eytcheson Ranches Solar (24INR0120) is listed in the ERCOT interconnection queue as a 76.4 MW solar project in Navarro County, TX. The filing names Tap 186 Navarro Mills – 107 Prairie Hill as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 1, 2028. It records the screening study as complete on November 29, 2021.

Queue ID24INR0120
Project nameEytcheson Ranches Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap 186 Navarro Mills – 107 Prairie Hill
Point of interconnectionTap 69kV 186 Navarro Mills – 107 Prairie Hill
CountyNavarro
StateTX
Voltage69 kV
Capacity76.4 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-01-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityGransolar Texas Fourteen, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2021-11-29
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.