Dovetail Solar 1
ERCOT queue ID 24INR0094
Dovetail Solar 1 (24INR0094) is listed in the ERCOT interconnection queue as a 666.1 MW solar project in Jack County, TX. The filing names Tap Willow Creek - Clear Crossing Ckt 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 12, 2028. It records the screening study as complete on December 9, 2021.
| Queue ID | 24INR0094 |
|---|---|
| Project name | Dovetail Solar 1 |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Willow Creek - Clear Crossing Ckt 2 |
| Point of interconnection | Tap 345 KV 1421 Willow Creek - 60515 Clear Crossing Ckt 2 |
| County | Jack |
| State | TX |
| Voltage | 345 kV |
| Capacity | 666.1 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-04-12 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Jack, TX: 18 requests in the ERCOT queue, 17 active totaling 7,978.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Hecate Energy Dovetail Solar 1 LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2021-12-09 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.