Yaupon Solar SLF
ERCOT queue ID 24INR0042
Yaupon Solar SLF (24INR0042) is listed in the ERCOT interconnection queue as a 200.8 MW solar project in Milam County, TX. The filing names Tap Gibson Switch – TNP One as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of November 18, 2026. It records the screening study as complete on June 17, 2021, the full interconnection study as approved on September 16, 2025 and the interconnection agreement as signed on September 28, 2023.
| Queue ID | 24INR0042 |
|---|---|
| Project name | Yaupon Solar SLF |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Gibson Switch – TNP One |
| Point of interconnection | Tap 345 kV Gibson Switch (3706) – TNP One (39950) |
| County | Milam |
| State | TX |
| Voltage | 345 kV |
| Capacity | 200.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-11-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Yaupon Solar, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2023-09-28 |
| Screening study complete | 2021-06-17 |
| Full interconnection study approved | 2025-09-16 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.