Compadre Solar

ERCOT queue ID 24INR0023

Compadre Solar (24INR0023) is listed in the ERCOT interconnection queue as a 405.7 MW solar project in Hill County, TX. The filing names tap Sam Switch - Venus as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 31, 2026. It records the screening study as complete on May 28, 2021, the full interconnection study as approved on January 31, 2024 and the interconnection agreement as signed on November 12, 2022.

Queue ID24INR0023
Project nameCompadre Solar
Status (as published)SS Completed, FIS Completed, IA
Substationtap Sam Switch - Venus
Point of interconnectiontap 345kV 68090 Sam Switch - 1907 Venus
CountyHill
StateTX
Voltage345 kV
Capacity405.7 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-10-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Hill, TX: 27 requests in the ERCOT queue, 23 active totaling 7,894.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityHill Solar I, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2022-11-12
Screening study complete2021-05-28
Full interconnection study approved2024-01-31
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.