Percy Farm Solar
ERCOT queue ID 24INR0020
Percy Farm Solar (24INR0020) is listed in the ERCOT interconnection queue as a 198.6 MW solar project in Matagorda County, TX. The filing names Tap Blessing - STP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 31, 2029. It records the screening study as complete on June 11, 2021.
| Queue ID | 24INR0020 |
|---|---|
| Project name | Percy Farm Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Blessing - STP |
| Point of interconnection | Tap 345kV 8123 Blessing - 5915 STP |
| County | Matagorda |
| State | TX |
| Voltage | 345 kV |
| Capacity | 198.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-05-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Percy Farm Solar 1, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2021-06-11 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.