Lamar Unit 1 Repower
ERCOT queue ID 23INR0486
Lamar Unit 1 Repower (23INR0486) is listed in the ERCOT interconnection queue as a 66 MW gas project in Lamar County, TX. The filing names Paris Switch Station as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 18, 2027. It records the screening study as complete on August 30, 2022.
| Queue ID | 23INR0486 |
|---|---|
| Project name | Lamar Unit 1 Repower |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Paris Switch Station |
| Point of interconnection | 1692 Paris Switch Station 345kV |
| County | Lamar |
| State | TX |
| Voltage | 345 kV |
| Capacity | 66 MW |
| Resource (as published) | GAS/CC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2027-12-18 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | La Frontera Holdings, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | GAS |
| Technology code | CC |
| Screening study complete | 2022-08-30 |