Substation Scout

Shoshana Storage

ERCOT queue ID 23INR0466

Shoshana Storage (23INR0466) is listed in the ERCOT interconnection queue as a 221 MW battery project in Matagorda County, TX. The filing names Tap STP – Refuge ckt 27 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of May 30, 2028. It records the screening study as complete on June 26, 2022.

Queue ID23INR0466
Project nameShoshana Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationTap STP – Refuge ckt 27
Point of interconnectionTap STP – Refuge ckt 27
CountyMatagorda
StateTX
VoltageNot reported
Capacity221 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-05-30
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityShoshana Storage Project LLC
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2022-06-26

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.