Substation Scout

Bug Tussle Wind Project

ERCOT queue ID 23INR0441

Bug Tussle Wind Project (23INR0441) is listed in the ERCOT interconnection queue as a 396.8 MW wind project in Lamar County, TX. The filing names Tap Valley South and Paris as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of September 18, 2028. It records the screening study as complete on April 11, 2022 and the interconnection agreement as signed on July 10, 2024.

Queue ID23INR0441
Project nameBug Tussle Wind Project
Status (as published)SS Completed, FIS Started, IA
SubstationTap Valley South and Paris
Point of interconnectionTap 1729 Valley South and 1692 Paris
CountyLamar
StateTX
VoltageNot reported
Capacity396.8 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2028-09-18
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Lamar, TX: 28 requests in the ERCOT queue, 25 active totaling 6,189.8 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBug Tussle Wind, LLC
CDR reporting zoneNORTH
Fuel codeWIN
Technology codeWT
Interconnection agreement signed2024-07-10
Screening study complete2022-04-11
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.