Coneflower Storage Project
ERCOT queue ID 23INR0425
Coneflower Storage Project (23INR0425) is listed in the ERCOT interconnection queue as a 170.9 MW battery project in Chambers County, TX. The filing names JORDON as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of February 28, 2028. It records the screening study as complete on March 11, 2022, the full interconnection study as approved on March 19, 2026 and the interconnection agreement as signed on March 25, 2024.
| Queue ID | 23INR0425 |
|---|---|
| Project name | Coneflower Storage Project |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | JORDON |
| Point of interconnection | 40855 JORDON 138 kV |
| County | Chambers |
| State | TX |
| Voltage | 138 kV |
| Capacity | 170.9 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-02-28 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Chambers, TX: 3 requests in the ERCOT queue, 2 active totaling 867.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Coneflower Storage Project LLC |
|---|---|
| CDR reporting zone | HOUSTON |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2024-03-25 |
| Screening study complete | 2022-03-11 |
| Full interconnection study approved | 2026-03-19 |
| Air permit | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.