Liberty Senate Energy Storage 1

ERCOT queue ID 23INR0334

Liberty Senate Energy Storage 1 (23INR0334) is listed in the ERCOT interconnection queue as a 207.4 MW battery project in Jack County, TX. The filing names Burwick as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 27, 2027. It records the screening study as complete on December 8, 2021.

Queue ID23INR0334
Project nameLiberty Senate Energy Storage 1
Status (as published)SS Completed, FIS Started, No IA
SubstationBurwick
Point of interconnection1445 Burwick 345kV
CountyJack
StateTX
Voltage345 kV
Capacity207.4 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2027-10-27
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Jack, TX: 18 requests in the ERCOT queue, 17 active totaling 7,978.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entitySenate Solar LLC
CDR reporting zoneNORTH
Fuel codeOTH
Technology codeBA
Screening study complete2021-12-08
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first