Skull Creek Solar
ERCOT queue ID 23INR0289
| Queue ID | 23INR0289 |
|---|---|
| Project name | Skull Creek Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap Tennessee Colony - Blackfoot Massey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation |
| Point of interconnection | Tap 138kV 3281 Tennessee Colony - 3499 Blackfoot Massey Lake Switch in TSP’s Pin Oak Switch - Long Lake Substation |
| County | Anderson |
| State | TX |
| Voltage | 138 kV |
| Capacity | 137 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-07-30 |
| Source dataset | large |
Additional filed fields
| Interconnecting Entity | Skull Creek Solar, LLC |
|---|---|
| Cdr Zone | NORTH |
| Fuel Code | SOL |
| Technology Code | PV |
| Ia Signed | 45432 |
| Screening Study Complete | 44427 |
| Air Permit | Not Required |
| Water Availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.