Poco Trail Solar
ERCOT queue ID 23INR0273
Poco Trail Solar (23INR0273) is listed in the ERCOT interconnection queue as a 438.8 MW solar project in Wilbarger County, TX. The filing names Tap Riley - Bowman Byrd Road Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of April 2, 2029. It records the screening study as complete on November 30, 2021.
| Queue ID | 23INR0273 |
|---|---|
| Project name | Poco Trail Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Riley - Bowman Byrd Road Switch |
| Point of interconnection | Tap 345kV 6101 Riley - 1422 Bowman Byrd Road Switch |
| County | Wilbarger |
| State | TX |
| Voltage | 345 kV |
| Capacity | 438.8 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-04-02 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Wilbarger, TX: 24 requests in the ERCOT queue, 21 active totaling 8,450.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Eastern Trail Solar Center, LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2021-11-30 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.