Substation Scout

Hoyte Solar

ERCOT queue ID 23INR0235

Hoyte Solar (23INR0235) is listed in the ERCOT interconnection queue as a 206.8 MW solar project in Milam County, TX. The filing names Cannon Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 17, 2027. It records the screening study as complete on July 2, 2021, the full interconnection study as approved on March 16, 2026 and the interconnection agreement as signed on October 14, 2022.

Queue ID23INR0235
Project nameHoyte Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationCannon Switch
Point of interconnection(3707) Cannon Switch 138kV
CountyMilam
StateTX
Voltage138 kV
Capacity206.8 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMilano Solar LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2022-10-14
Screening study complete2021-07-02
Full interconnection study approved2026-03-16
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.