Goodalta Solar
ERCOT queue ID 23INR0171
Goodalta Solar (23INR0171) is listed in the ERCOT interconnection queue as a 221.4 MW solar project in Navarro County, TX. The filing names tap Trinidad - 212 Winkler as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of September 20, 2027. It records the screening study as complete on April 12, 2021 and the full interconnection study as approved on February 17, 2026.
| Queue ID | 23INR0171 |
|---|---|
| Project name | Goodalta Solar |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | tap Trinidad - 212 Winkler |
| Point of interconnection | tap 138kV 3127 Trinidad - 212 Winkler |
| County | Navarro |
| State | TX |
| Voltage | 138 kV |
| Capacity | 221.4 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-09-20 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | GoodAlta Power Center LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2021-04-12 |
| Full interconnection study approved | 2026-02-17 |
| Water availability | Not Required |