Sepik BESS
ERCOT queue ID 23INR0143
Sepik BESS (23INR0143) is listed in the ERCOT interconnection queue as a 205 MW battery project in Mitchell County, TX. The filing names tap Loraine South – Ranger Camp as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of March 1, 2028. It records the screening study as complete on March 15, 2021.
| Queue ID | 23INR0143 |
|---|---|
| Project name | Sepik BESS |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap Loraine South – Ranger Camp |
| Point of interconnection | tap 138kV 11342 Loraine South – 10050 Ranger Camp |
| County | Mitchell |
| State | TX |
| Voltage | 138 kV |
| Capacity | 205 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-03-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Mitchell, TX: 19 requests in the ERCOT queue, 17 active totaling 7,498.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BRP Sepik BESS LLC |
|---|---|
| CDR reporting zone | WEST |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2021-03-15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.