Substation Scout

Charger Solar

ERCOT queue ID 23INR0047

Queue ID23INR0047
Project nameCharger Solar
Status (as published)SS Completed, FIS Completed, IA
Substationtap Angstrom – STP
Point of interconnectiontap 345kV 8249 Angstrom – 5915 STP
CountyRefugio
StateTX
Voltage345 kV
Capacity397.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2026-09-18
Source datasetlarge

Additional filed fields

Interconnecting EntityAP Solar 4, LLC
Cdr ZoneCOASTAL
Fuel CodeSOL
Technology CodePV
Ia Signed44352
Screening Study Complete44082
Fis Approved45922
Air PermitNot Required
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.