Sierra Madre Solar

ERCOT queue ID 23INR0006

Queue ID23INR0006
Project nameSierra Madre Solar
Status (as published)SS Completed, FIS Started, No IA
Substationtap Del Sol - Cenizo
Point of interconnectiontap 345kV 80307 Del Sol - 80225 Cenizo
CountyZapata
StateTX
Voltage345 kV
Capacity255.2 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2027-12-01
Source datasetlarge

Additional filed fields

Interconnecting EntitySierra Madre Solar LLC
Cdr ZoneSOUTH
Fuel CodeSOL
Technology CodePV
Screening Study Complete43929
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.