Substation Scout

Camino Santiago Solar

ERCOT queue ID 22INR0605

Camino Santiago Solar (22INR0605) is listed in the ERCOT interconnection queue as a 196.3 MW solar project in Milam County, TX. The filing names Herndon Switch Substation (#) as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of September 1, 2027. It records the screening study as complete on November 30, 2022, the full interconnection study as approved on September 17, 2026 and the interconnection agreement as signed on December 6, 2024.

Queue ID22INR0605
Project nameCamino Santiago Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationHerndon Switch Substation (#)
Point of interconnection345 kV Herndon Switch Substation (#3804)
CountyMilam
StateTX
Voltage345 kV
Capacity196.3 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-09-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 Status change n/a SS Completed, FIS Started, IA → SS Completed, FIS Completed, IA

Full change log →

Additional filed fields

Interconnecting entityCamino Solar Project, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2024-12-06
Screening study complete2022-11-30
Full interconnection study approved2026-09-17
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.