Sandow Solar
ERCOT queue ID 22INR0350
Sandow Solar (22INR0350) is listed in the ERCOT interconnection queue as a 287.2 MW solar project in Milam County, TX. The filing names tap one Austrop - Sandow line as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of June 1, 2028. It records the screening study as complete on February 8, 2021 and the full interconnection study as approved on July 18, 2024.
| Queue ID | 22INR0350 |
|---|---|
| Project name | Sandow Solar |
| Status (as published) | SS Completed, FIS Completed, No IA |
| Substation | tap one Austrop - Sandow line |
| Point of interconnection | tap one 345kV 7040 Austrop - 13429 Sandow line |
| County | Milam |
| State | TX |
| Voltage | 345 kV |
| Capacity | 287.2 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-06-01 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Sandow Lakes Ranch Solar I, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2021-02-08 |
| Full interconnection study approved | 2024-07-18 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.