Matagorda Solar (22INR0342) is listed in the ERCOT interconnection queue as a 101 MW solar project in Matagorda County, TX. The filing names Shropshire as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of August 25, 2027. It records the screening study as complete on July 15, 2020, the full interconnection study as approved on September 14, 2021 and the interconnection agreement as signed on June 8, 2022.

Queue ID22INR0342
Project nameMatagorda Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationShropshire
Point of interconnection5555 Shropshire 69kV
CountyMatagorda
StateTX
Voltage69 kV
Capacity101 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-25
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Matagorda, TX: 30 requests in the ERCOT queue, 23 active totaling 5,513.1 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMatagorda Solar Farm, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2022-06-08
Screening study complete2020-07-15
Full interconnection study approved2021-09-14
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first