Sbranch Solar

ERCOT queue ID 22INR0205

Sbranch Solar (22INR0205) is listed in the ERCOT interconnection queue as a 233.5 MW solar project in Wharton County, TX. The filing names Tap East Bernard - Caney as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 31, 2026. It records the screening study as complete on March 13, 2019, the full interconnection study as approved on July 29, 2021 and the interconnection agreement as signed on July 26, 2020.

Queue ID22INR0205
Project nameSbranch Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationTap East Bernard - Caney
Point of interconnectionTap 138kV 44190 East Bernard - 44130 Caney
CountyWharton
StateTX
Voltage138 kV
Capacity233.5 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-10-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Wharton, TX: 44 requests in the ERCOT queue, 42 active totaling 8,624.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBernard Creek Solar, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2020-07-26
Screening study complete2019-03-13
Full interconnection study approved2021-07-29
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.