Brazos Wind Repower

ERCOT queue ID 21INR0532

Brazos Wind Repower (21INR0532) is listed in the ERCOT interconnection queue as a 22.4 MW wind project in Scurry County, TX. The filing names Sun as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, No IA”, with a target commercial operation date of November 14, 2025. It records the screening study as complete on March 10, 2021 and the full interconnection study as approved on April 1, 2022.

Queue ID21INR0532
Project nameBrazos Wind Repower
Status (as published)SS Completed, FIS Completed, No IA
SubstationSun
Point of interconnection1064 Sun 138kV
CountyScurry
StateTX
Voltage138 kV
Capacity22.4 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2025-11-14
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Scurry, TX: 23 requests in the ERCOT queue, 17 active totaling 5,057.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBRAZOS WIND VENTURES, LLC
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Screening study complete2021-03-10
Full interconnection study approved2022-04-01
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first