Board Creek Wind
ERCOT queue ID 21INR0324
Board Creek Wind (21INR0324) is listed in the ERCOT interconnection queue as a 299.2 MW wind project in Navarro County, TX. The filing names Outlaw Switch as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of October 31, 2026. It records the screening study as complete on July 22, 2019, the full interconnection study as approved on April 26, 2022 and the interconnection agreement as signed on August 19, 2021.
| Queue ID | 21INR0324 |
|---|---|
| Project name | Board Creek Wind |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Outlaw Switch |
| Point of interconnection | 345kV 3386 Outlaw Switch |
| County | Navarro |
| State | TX |
| Voltage | 345 kV |
| Capacity | 299.2 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2026-10-31 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Navarro, TX: 29 requests in the ERCOT queue, 26 active totaling 4,412.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Limestone Wind Project, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | WIN |
| Technology code | WT |
| Interconnection agreement signed | 2021-08-19 |
| Screening study complete | 2019-07-22 |
| Full interconnection study approved | 2022-04-26 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.