Eastbell Milam Solar

ERCOT queue ID 21INR0203

Eastbell Milam Solar (21INR0203) is listed in the ERCOT interconnection queue as a 244.9 MW solar project in Milam County, TX. The filing names Bell County East Switch (bus# ) - TNP One (bus# ) circuit 2 as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of November 1, 2026. It records the screening study as complete on December 9, 2018, the full interconnection study as approved on October 28, 2022 and the interconnection agreement as signed on September 2, 2022.

Queue ID21INR0203
Project nameEastbell Milam Solar
Status (as published)SS Completed, FIS Completed, IA
SubstationBell County East Switch (bus# ) - TNP One (bus# ) circuit 2
Point of interconnection345 kV Bell County East Switch (bus# 3687) - TNP One (bus# 39950) circuit 2
CountyMilam
StateTX
Voltage345 kV
Capacity244.9 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-11-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bell County East Switch (bus# ) - TNP One (bus# ) circuit 2 substation: 2 requests in the ERCOT queue, 2 active totaling 395.5 MW.

Queue IDProjectMWResourceStatus
24INR0208Eastbell Milam Solar II150.6SolarSS Completed, FIS Completed, IA

Milam, TX: 35 requests in the ERCOT queue, 30 active totaling 8,525.6 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityEDP RENEWABLES NORTH AMERICA LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Interconnection agreement signed2022-09-02
Screening study complete2018-12-09
Full interconnection study approved2022-10-28
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.