Giddings Wind

ERCOT queue ID 21INR0006

Giddings Wind (21INR0006) is listed in the ERCOT interconnection queue as a 240 MW wind project in Upton County, TX. The filing names Upton as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 9, 2030. It records the screening study as complete on August 19, 2019.

Queue ID21INR0006
Project nameGiddings Wind
Status (as published)SS Completed, FIS Started, No IA
SubstationUpton
Point of interconnection71212 Upton 138kV
CountyUpton
StateTX
Voltage138 kV
Capacity240 MW
Resource (as published)WIN/WT
Resource categoryWind (normalized for filtering)
Target commercial operation2030-09-09
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Upton, TX: 22 requests in the ERCOT queue, 18 active totaling 5,611.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityPioneer Natural Resources
CDR reporting zoneWEST
Fuel codeWIN
Technology codeWT
Screening study complete2019-08-19
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.