Substation Scout

Grandfalls Solar

ERCOT queue ID 19INR0002

Grandfalls Solar (19INR0002) is listed in the ERCOT interconnection queue as a 175.6 MW solar project in Upton County, TX. The filing names 842 King Mountain Station as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of November 25, 2026. It records the screening study as complete on June 6, 2016, the full interconnection study as approved on December 17, 2025 and the interconnection agreement as signed on January 23, 2025.

Queue ID19INR0002
Project nameGrandfalls Solar
Status (as published)SS Completed, FIS Completed, IA
Substation842 King Mountain Station
Point of interconnection842 King Mountain Station 345kV
CountyUpton
StateTX
Voltage345 kV
Capacity175.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2026-11-25
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Upton, TX: 22 requests in the ERCOT queue, 18 active totaling 5,611.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityKing Mountain Solar, LLC
CDR reporting zoneWEST
Fuel codeSOL
Technology codePV
Interconnection agreement signed2025-01-23
Screening study complete2016-06-06
Full interconnection study approved2025-12-17
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first