Vaquero 1 Wind
ERCOT queue ID 17INR0043
Vaquero 1 Wind (17INR0043) is listed in the ERCOT interconnection queue as a 400 MW wind project in Zapata County, TX. The filing names tap N Edinb - Lon Hill as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of January 15, 2027. It records the screening study as complete on May 10, 2016.
| Queue ID | 17INR0043 |
|---|---|
| Project name | Vaquero 1 Wind |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | tap N Edinb - Lon Hill |
| Point of interconnection | tap 345kV 8905 N Edinb - 8455 Lon Hill |
| County | Zapata |
| State | TX |
| Voltage | 345 kV |
| Capacity | 400 MW |
| Resource (as published) | WIN/WT |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2027-01-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Zapata, TX: 28 requests in the ERCOT queue, 27 active totaling 6,291.1 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Enerverse |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | WIN |
| Technology code | WT |
| Screening study complete | 2016-05-10 |
| Air permit | Not Required |
| Water availability | Not Required |