Willacy, TX interconnection queue

6 active projects totalling 1,086.7 MW in the ERCOT queue.

6active projects
1,086.7active MW
6total filed
Queue IDProjectkVMWResourceStatus
20INR0097 El Sauz Ranch 345 301.5 Wind SS Completed, FIS Completed, IA
19INR0023 Monte Alto 2 Wind 345 199.2 Wind SS Completed, FIS Started, IA
26INR0507 Los Vientos IB Repower 138 184.8 Wind SS Completed, FIS Started, No IA
23INR0496 San Perlita BESS 1 345 150 Battery SS Completed, FIS Started, No IA
23INR0497 San Perlita BESS 2 345 150 Battery SS Completed, FIS Started, No IA
24INR0534 Lyford Energy 138 101.2 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.