Waller, TX interconnection queue
5 active projects totalling 924.1 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).
5active projects
924.1active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 27INR0235 | Ochoa Energy Storage II | n/r | 516.6 | Battery | Cancelled |
| 26INR0425 | Twinwood Solar 1 | 138 | 358.1 | Solar | SS Completed, FIS Started, IA |
| 26INR0243 | Caladium BESS | 69 | 201.3 | Battery | SS Completed, FIS Started, No IA |
| 24INR0461 | Augie BESS | 138 | 200.8 | Battery | SS Completed, FIS Completed, No IA |
| 26INR0426 | Maderagemela BESS1 | 138 | 154 | Battery | SS Completed, FIS Started, IA |
| 26INR0773 | Seaway BESS | 138 | 9.9 | Battery | In Queue |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.