Substation Scout

Waller, TX interconnection queue

4 active projects totalling 914.2 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

4active projects
914.2active MW
5total filed
Queue IDProjectkVMWResourceStatus
27INR0235 Ochoa Energy Storage II n/r 516.6 Battery Cancelled
26INR0425 Twinwood Solar 1 138 358.1 Solar SS Completed, FIS Started, IA
26INR0243 Caladium BESS 69 201.3 Battery SS Completed, FIS Started, No IA
24INR0461 Augie BESS 138 200.8 Battery SS Completed, FIS Completed, No IA
26INR0426 Maderagemela BESS1 138 154 Battery SS Completed, FIS Started, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.