Palo Pinto, TX interconnection queue

3 active projects totalling 365 MW in the ERCOT queue.

3active projects
365active MW
3total filed
Queue IDProjectkVMWResourceStatus
26INR0364 Pollo Pinto Solar 138 150.8 Solar SS Completed, FIS Completed, No IA
25INR0482 Vault Solar 138 108.5 Solar SS Completed, FIS Completed, IA
21INR0509 McClure Solar 69 105.7 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.