Substation Scout

Motley, TX interconnection queue

3 active projects totalling 852 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

3active projects
852active MW
4total filed
Queue IDProjectkVMWResourceStatus
28INR0017 Sitges Wind 345 600 Wind SS Completed, FIS Started, No IA
25INR0516 Collier Ranch Solar n/r 253 Solar Inactive
24INR0399 Buzios Solar n/r 252 Solar SS Completed, FIS Completed, IA
29INR0021 Buzios BESS SLF 345 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.