Substation Scout

Madison, TX interconnection queue

4 active projects totalling 814.3 MW in the ERCOT queue.

4active projects
814.3active MW
4total filed
Queue IDProjectkVMWResourceStatus
25INR0176 Masava Storage 345 257 Battery SS Completed, FIS Started, No IA
26INR0411 Tex-Bar ESS 345 201.5 Battery SS Completed, FIS Completed, IA
25INR0286 Savannah Oaks Solar 345 201.2 Solar SS Completed, FIS Started, No IA
25INR0131 SOSA Storage 138 154.6 Battery SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.