Loving, TX interconnection queue

2 active projects totalling 244.3 MW in the ERCOT queue.

2active projects
244.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
30INR0099 Quadspring BESS 138 200.7 Battery SS Completed, FIS Started, No IA
26INR0529 Electric E - West Texas Generation 138 43.6 Gas SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.