Substation Scout

Fayette, TX interconnection queue

4 active projects totalling 1,016 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

4active projects
1,016active MW
5total filed
Queue IDProjectkVMWResourceStatus
29INR0249 Lightcycle Energy Storage 345 409.7 Battery SS Completed, FIS Started, No IA
27INR0137 Moonlit Bayou Storage 138 209.2 Battery Cancelled
28INR0150 South Tripoint BESS 138 204.5 Battery SS Completed, FIS Started, No IA
25INR0189 Staccato BESS 138 201.8 Battery SS Completed, FIS Completed, IA
25INR0512 Monument Hill Solar 345 200 Solar SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.