Substation Scout

Crosby, TX interconnection queue

1 active project totalling 252.5 MW in the ERCOT queue.

1active projects
252.5active MW
1total filed
Queue IDProjectkVMWResourceStatus
26INR0647 Wake Wind Energy Repower n/r 252.5 Wind SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.