Crockett, TX interconnection queue
9 active projects totalling 1,894.6 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).
9active projects
1,894.6active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0442 | Midnight Sun Energy Storage | 138 | 523.9 | Battery | SS Completed, FIS Started, IA |
| 29INR0184 | Gridline Solar | n/r | 400 | Solar | SS Completed, FIS Started, No IA |
| 29INR0073 | Oasis wind | 138 | 300 | Wind | SS Started, FIS Started, No IA |
| 16INR0104 | Big Sampson Wind | 345 | 265.4 | Wind | SS Completed, FIS Completed, IA |
| 28INR0012 | Shamrock II Wind | n/r | 256.6 | Wind | Inactive |
| 25INR0489 | Ranchero BESS | 345 | 150 | Battery | SS Completed, FIS Started, No IA |
| 26INR0365 | BLACK BEAR SOLAR | 138 | 102.9 | Solar | SS Completed, FIS Started, No IA |
| 22INR0455 | Blue Sky Sol | 138 | 101.2 | Solar | SS Completed, FIS Started, IA |
| 26INR0366 | BLACK BEAR BESS | 138 | 51.2 | Battery | SS Completed, FIS Started, No IA |
| 25INR0216 | Blue Sky Storage SLF | 138 | 0 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.