Citrus Combined Cycle Substation substation interconnection queue
4 active projects totaling 2,153.9 MW in the Duke Energy queue, plus 1 with terminal status (shown grayed).
5 Duke Energy queue filings name Citrus Combined Cycle Substation as the point of interconnection, all in Citrus County, FL.
4active projects
2,153.9active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 123 | Not reported | n/r | 940 | Gas | Operational |
| 124 | Not reported | n/r | 940 | Gas | Operational |
| FC100380 | Not reported | 230 | 199 | Battery | Active |
| 199 | Not reported | n/r | 74.9 | Solar | Operational |
| 234 | Not reported | n/r | 74.9 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.