Substation Scout

Pasco, FL interconnection queue

7 active projects totaling 1,361.6 MW in the Duke Energy queue, plus 8 with terminal status (shown grayed).

7active projects
1,361.6active MW
15total filed
Queue IDProjectkVMWResourceStatus
109 Not reported n/r 1,400 Gas Withdrawn
110 Not reported n/r 1,400 Gas Withdrawn
93 Not reported n/r 650 Gas Withdrawn
137 Not reported n/r 575 Gas Active
5 Not reported 230 480 Gas Operational
129 Not reported n/r 400 Other Withdrawn
77 Not reported n/r 345 Gas Withdrawn
116 Not reported n/r 220 Other Withdrawn
FC100009 Not reported 230 199 Battery Active
237 Not reported n/r 74.5 Solar Active
FC100000 Not reported 115 13.1 Other Active
53 Not reported n/r 10 Gas Operational
55 Not reported n/r 10 Gas Operational
52 Not reported n/r 9 Gas Withdrawn
54 Not reported n/r 9 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first